CIS-RC Mock Paper 3 1419 Created on July 20, 2022 By ServiceNow Gyan CIS-RC Mock Paper 3 This Quiz contains Multiple Choice Questions related to Risk and Compliance Application that will help you to pass Certified Implementation Specialist – Risk and Compliance (CIS-RC) certification.Instructions:Number of Questions: 45Time Limit: 1 Hour 30 MinutesPassing Marks: 70% 1 / 45 In which Risk Response task “Risk Owner” approval is required to move Risk and Risk Acceptance Task to the Review state. Risk Acceptance Risk Avoidance Risk Transfer Risk Mitigation 2 / 45 HIPAA stands for Health Insurance Policy and Accountability Action Health Insurance Policy and Accountable Act Health Insurance Portability and Accountability Act Health Insurance Policy and Account Act 3 / 45 If a company is performing similar tests across many of their technical and process controls. What will be the best approach? Leverage test templates Create a test plan for all controls Create a test plan for each control Create Engagement templates 4 / 45 Which of the following tables exist within the GRC: Policy and Compliance Management scope? (Choose three) Citation Document Content Authority document Control objective 5 / 45 For Policy and Compliance, which role is required to create GRC attestation metric type? Attestation User Attestation Manager Attestation Admin Attestation Creator 6 / 45 Implementation team required to run GRC Project. (Choose three) Business Process Analyst Project Manager Database Administrator Technical Consultant 7 / 45 Which role(s) has the capability to create Policies? Choose two.) Compliance Admin Risk Manager Compliance User Compliance Manager 8 / 45 What is the database name of table Control objective? [sn_compliance_policy_statement] [sn_compliance_control_objective] [sn_policy_control_objective] [sn_grc_control_objective] 9 / 45 The scheduled job that runs every hour to update entity records. GRC Entity Generation GRC Daily Entity Generation GRC Populate Entity GRC Profile Generation 10 / 45 The Flow that triggers based on the substate field in Policy Exception. Generate initial approvals for policy exception Generate substate approvals for policy exception Generate Awaiting Approvals for policy exception Generate final approvals for policy exception 11 / 45 To use Advanced Risk Assessment, we define factors. The different factors are: (Choose four) Residual factor Automated factor Scripted Automated factor Manual factor Group factor Control factor 12 / 45 Which table stored the links from “Control Objective to Citation”? [sn_compliance_m2m_statement_citation] [sn_policy_m2m_statement_citation] [sn_compliance_m2m_control_objective_citation] [sn_policy_m2m_control_objective_citation] 13 / 45 The Control Objective does not have their own record lifecycle, they depend on Policy state. False True 14 / 45 The Users with the role ________ and higher can be assigned to a Risk Response task. sn_risk.owner sn_grc_risk.user sn_risk.user sn_risk.reader 15 / 45 What is the database name of the table “Entity Type”? sn_grc_entity_type sn_grc_risk_entity_type sn_grc_risk_profile_type sn_grc_profile_type 16 / 45 By default, what is the weight of controls while creation? 1 5 100 10 17 / 45 When selecting policy exception sources: (Select four) The selected Policy, Control Objective, and Issues must be related. Issues in Draft or Retired state cannot be selected. Only Issues with an active control can be selected. Only published Policies can be selected. Only Policies in Review can be selected. Only Issues in Respond state can be selected. 18 / 45 Different Entity scoping approaches? (Choose two) Standard Planned Operational Strategic 19 / 45 You are working with your customer to determine necessary audit management workflow configurations. What should they know about the approval process for audit engagements? (Choose three) If the engagement is approved and there are no remaining open tasks or issues, it automatically moves into the Closed state. If the engagement is approved and there are remaining open tasks or issues, it automatically moves into the Fieldwork state. If the engagement is rejected, it automatically moves into the Scope state. If the engagement is rejected, it automatically moves back to the Fieldwork state. If the engagement is approved and there are remaining open tasks or issues, it automatically moves into the Follow Up state. 20 / 45 Which role is required to set up Policy Acknowledgement campaign? (Select two) Policy Reviewer Compliance User Policy Approver Policy Owner 21 / 45 Policies are created in which state? New Draft Open Work In Progress 22 / 45 The minimum role required to create risk record. sn_risk.reader sn_risk.editor sn_risk.user sn_risk.developer 23 / 45 Which Audit task is used to determine the overall effectiveness of a control? Control Test Interview Activity Walkthrough 24 / 45 The SOX content pack includes a series of policies, control, risks. How are all of these components linked together? Manually Batch import Automatically Mapping File 25 / 45 Which GRC application would you use to manage internal or external consultancy processes that aim to prove the effectiveness of controls? Audit Management Risk Management Vendor Risk Management Policy and Compliance Management 26 / 45 Minimum role required to request a Policy Exception from the Service Portal? sn_compliance.user sn_compliance.manager admin snc_internal 27 / 45 David is an Audit Manager. In addition to Audit Manager, which roles should be assigned to ensure he can manage the audit process as well as other GRC functions related to audit? (Choose two) sn_grc.developer sn_grc.manager sn_grc.user sn_grc.reader sn_audit.user 28 / 45 What are the different states available out of the box for classic/standard Risk management? Draft, Assess, Respond, Review, Monitor, Retired New, Awaiting Approval, Respond, Review, Monitor, Retired Draft, Assess, Review, Monitor, Retired New, Assess, Respond, Review, Monitor, Retired 29 / 45 Can Control Objective belong to more than one Policy? False True 30 / 45 If a person is submitting Policy Exception through Service Portal. In which state the Record Producer creates the Policy Exception? New Awaiting Approval Analyze Draft 31 / 45 What is the database name of the table “Entity”? sn_grc_entity sn_grc_profile sn_risk_entity sn_risk_profile 32 / 45 All of the following tables are extended from Content table except. Citation Risk Framework Control objective Risk Statement 33 / 45 Indicator Templates can be related to _______ and _______ . (Choose two) Risk Statement Control objective Controls Risk Framework 34 / 45 After an engagement has been approved and there are no remaining open tasks or issues and observations associated with the engagement, the engagement automatically moves from Awaiting Approval into which state. Fieldwork Approved Follow Up Closed 35 / 45 For Risk Acceptance task, who is notified through notifications to approve the task? Risk Owner Risk Users Risk Managers Risk Approver 36 / 45 Engagement [sn_audit_engagement] table is extended from: Planned Task [planned_task] Audit Task [sn_audit_task] Base Audit Test [sn_audit_base_test] Task[task] 37 / 45 Which filter navigation syntax displays the table in list view within a separate browser tab? Tablename_LIST Tablename.LIST Tablename.List Tablename.list 38 / 45 The Script Include where it is defined to modify the Policy Acknowledgement process. ControlGeneratorStrategy ComplianceUtils PolicyAcknowledgementUtil ComplianceScoreCalculator 39 / 45 The conditions under which Engagements move into the "Closed" state. (Select three) There are no open audit tasks, issues, and milestones after the engagement is approved. All follow-up tasks, issues, and milestones are closed out. If the engagement is Rejected, it will move to Closed state. The engagement is closed as incomplete during the Scope, Validate, or Fieldwork states. 40 / 45 What are the different states available out of the box for Policy Exception Lifecycle? New, Analyze, Review, Awaiting Approval, Approved, Closed New, Analyze, Review, Awaiting Approval, Closed Draft, Analyze, Review, Awaiting Approval, Approved, Closed Draft, Analyze, Review, Awaiting Approval, Closed 41 / 45 The Risk Scoring values are entered on the Risk Statement. What records inherits the values from the Risk Statement? Risk Framework Risk Criteria Matrix Risk Response Issue Registered Risk 42 / 45 The Script Include where it is defined to use a different criteria to create control records. ComplianceScoreCalculator ControlUtils PolicyAcknowledgementUtil ControlGeneratorStrategy 43 / 45 Which tables extend the Content (sn_grc_content) table? (Choose two) sn_grc_issue sn_risk_risk sn_compliance_citation sn_compliance_policy_statement 44 / 45 All of the following tables are extended from Document table except. Risk Framework Policy Risk Statement Authority document 45 / 45 What are the different states available out of the box for Policy Acknowledgement campaign lifecycle? Draft, New, Pending acknowledgement, Canceled Draft, New, Awaiting Approval, Closed Draft, New, Pending acknowledgement, Closed New, Pending acknowledgement, Closed, Canceled Your score is LinkedIn Facebook Twitter VKontakte 0% Restart quiz